Hilton Head Island Public Portal Historical Document Repository
1037- <br /> Approval#A-1:897 <br /> Town of Hilton Head Island <br /> One Town Center Court <br /> Hilton Head Island, SC 29928 <br /> TREE APPROVAL <br /> DATE: 8 September 2005 <br /> PROJECT NAME: Airport Improvements (Renovation of General Aviation Parking, etc.) <br /> LOCATION: Gateway Circle <br /> RECOMMENDATION _ Approval <br /> _X_ Approval with Conditions <br /> Disapproval <br /> CONDITIONS OF APPROVAL/REASON FOR DISAPPROVAL: <br /> 1) Pursuant to LMO Sections 16-3-409, this Tree Approval is subject to expiration. This Tree <br /> Approval will expire on 8 September 2006 unless a complete development plan review <br /> application [see Section 16-3-303] is submitted or, where development plan review is not <br /> required,the approved activity is completed. <br /> 2) This approval is based on plans drawn by Wilbur Smith and Associates dated August, 2004 <br /> and with numerous revisions,the last of which was for p. 51 a, received on 9-7-05. <br /> 3) Stakeout inspection prior to beginning work. Stake edges of all new pervious and <br /> impervious paving. In General Aviation parking lot, erect tree barricades at edge of <br /> pavement in islands around trees to be saved. Be prepared to make minor changes to the <br /> impervious surfaces around large trees to be saved (see condition 4 of this approval) <br /> including the addition of compact spaces. Flag trees to be removed in red. <br /> 4) Reduce drive aisle of parking to 20 feet under the canopy of the 27 inch live oak, the <br /> 14,18,20 live oaks and the oaks at the head of the middle island. Hold the edge of pavement <br /> opposite these trees and remove 4 feet of asphalt at the nearest edge. <br /> 5) No storage of materials, vehicles or equipment in any islands in the parking lot where <br /> existing trees are to be saved. <br /> 6) No planting of sod or any other landscape plants under the canopies of any existing trees in <br /> the parking lot that are 20 inches or larger in diameter. Apply shredded wood mulch only in <br /> these areas. <br /> 7) Add one red cedar to the mitigation planting plan on page 53 of the plans. <br /> 8) Prior to Certificate of Compliance inspection, install landscape timbers, two courses in <br /> height and secured to the ground with rebar, at the perimeter of the islands in the following <br />